New Pantai Highway

Connectivity

New Pantai Highway is a key urban highway in the Klang Valley, connecting Kuala Lumpur with major areas such as Subang Jaya, Petaling Jaya, Bangsar and the City Centre. Spanning approximately 19.6 kilometres, the highway plays an important role in facilitating daily travel, supporting economic activities, and improving regional connectivity.

The highway also provides improved access to major routes such as the Federal Highway Route 2, offering a reliable alternative to heavily congested urban roads.

To accommodate increasing traffic demand, the Government has approved the New Pantai Highway Extension Project, which is scheduled for completion in 2029. The 15.9-kilometre extension project, including ramps, will enhance traffic distribution, improve connectivity, increase road capacity, and support smarter highway operations with MLFF readiness and smart highway features.

The project is also expected to improve the Level of Service (LOS) at Jalan Bangsar, Pantai Dalam and Jalan Syed Putra, while strengthening connectivity with surrounding expressways including NPE, BESRAYA and the proposed LIKE Expressway.

Discover more on NPE Extension Project >

Head Office

New Pantai Expressway Sdn Bhd
199401022597 (308276-U)
KM 10.6, Plaza Tol Pantai Dalam, 
Lebuhraya Baru Pantai,
58200 Kuala Lumpur.

Contacts

Telephone (Office Hour): +603-7793-8800
NPE Hotline: 1300-88-1010
Fax: +603-7783-1111
Email : info.npe@ijm.com

Toll Fare

Type

Class

Description

Fare (RM)

Pantai Dalam

PJS 2

PJS 5

1 Vehicle with 2 axles and 3/4 wheels, excluding a taxi. 2.30 1.00 2.30
2 Vehicle with 2 axles and 6 wheels, excluding a bus. 4.60 4.60 4.60
3 Vehicle with 3 or more axles 6.90 6.90 6.90
4 Taxi 1.20 1.20 1.20
5 Bus 1.60 1.60 1.60

Point of Interest Locator

Click on the point of interest below to see location on map.

Facilities and Features

Parking Areas
Patrol Team
Surau

Enhancement Works

Road widening in progress.

Fact Sheet

6

Toll Plazas

10

Interchanges

9

Public Restrooms

6

Suraus

2

Slopes

1225

Street Lightings (LED)

13

Median Opening

258

Solar Panels

155.7

Lane Kilometer pavement

20

High Mast Lightings

11

Pedestrian Bridge

7

Bus stops

33

Bridges

16,474

erse Barrier (NJB)

6,650

Highway Guardrail Barriers

5

Motorcycle shelters

22

Culverts

6100m

Highway Fencing

First-Class Facilities for a Smoother Journey on NPE Highway

AI-powered highway ecosystem enhancing safety, efficiency, and real-time traffic management across the NPE Highway network.

AI-Powered Highway Monitoring

Enhancing road safety through intelligent surveillance and real-time incident detection.

24/7 Traffic Monitoring Centre

Continuous surveillance and live traffic management for smoother traffic flow and reduced congestion

Smart Surveillance Network

102 advanced smart cameras equipped with VIDS and ANPR for proactive monitoring and incident identification.

24/7 Highway Assistance

Hotline: 1 300-88-1010
Round-the-clock roadside assistance and public enquiry support

Variable Message Sign (VMS)

6 VMS for public announcements and traffic update

Toll & Payment Convenience

On-site reload facilities for seamless transactions

Seamless Toll Payment Gateway

Multiple payment options available for a faster and more convenient journey:

  • Touch’n Go
  • Bank Cards (Debit/Credit)
  • SmartTAG
  • RFID

Highway Facilities – Lay-bys

Three lay-bys available along the network:

  • PJS 2 Lay-by
  • PJS 5 Lay-by
  • Pantai Dalam Lay-by
Facilities include surau, toilets, and parking bays.

Scroll to Top